Sewage Ejector Pump Maintenance: A Safe Six-Month Routine
Sewage ejector pump maintenance keeps a basement sewage basin, pump, float switch, discharge line, check valve, and vent system operating before wastewater backs up. Inspect the system about every six months, isolate electrical power first, remove only accessible debris, test a complete pump cycle, and call a licensed plumber when the motor, sealed basin, wiring, […]